Citation Formats
An integrated system for duration estimation in design/build projects and organizations
  • IEEE
  • ACM
  • APA
  • Chicago
  • MLA
  • Harvard
  • BibTeX

A. Kanoğlu, "An integrated system for duration estimation in design/build projects and organizations," Engineering, Construction and Architectural Management , vol.10, no.4, pp.272-282, 2003

Kanoğlu, A. 2003. An integrated system for duration estimation in design/build projects and organizations. Engineering, Construction and Architectural Management , vol.10, no.4 , 272-282.

Kanoğlu, A., (2003). An integrated system for duration estimation in design/build projects and organizations. Engineering, Construction and Architectural Management , vol.10, no.4, 272-282.

Kanoğlu, Alaattin. "An integrated system for duration estimation in design/build projects and organizations," Engineering, Construction and Architectural Management , vol.10, no.4, 272-282, 2003

Kanoğlu, Alaattin. "An integrated system for duration estimation in design/build projects and organizations." Engineering, Construction and Architectural Management , vol.10, no.4, pp.272-282, 2003

Kanoğlu, A. (2003) . "An integrated system for duration estimation in design/build projects and organizations." Engineering, Construction and Architectural Management , vol.10, no.4, pp.272-282.

@article{article, author={Alaattin Kanoğlu}, title={An integrated system for duration estimation in design/build projects and organizations}, journal={Engineering, Construction and Architectural Management}, year=2003, pages={272-282} }