A. Damcı Et Al. , "Multiresource Leveling in Line-of-Balance Scheduling," JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT , vol.139, no.9, pp.1108-1116, 2013
Damcı, A. Et Al. 2013. Multiresource Leveling in Line-of-Balance Scheduling. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT , vol.139, no.9 , 1108-1116.
Damcı, A., Arditi, D., & POLAT, G., (2013). Multiresource Leveling in Line-of-Balance Scheduling. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT , vol.139, no.9, 1108-1116.
Damcı, Atilla, David Arditi, And Gul POLAT. "Multiresource Leveling in Line-of-Balance Scheduling," JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT , vol.139, no.9, 1108-1116, 2013
Damcı, Atilla Et Al. "Multiresource Leveling in Line-of-Balance Scheduling." JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT , vol.139, no.9, pp.1108-1116, 2013
Damcı, A. Arditi, D. And POLAT, G. (2013) . "Multiresource Leveling in Line-of-Balance Scheduling." JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT , vol.139, no.9, pp.1108-1116.
@article{article, author={Atilla Damcı Et Al. }, title={Multiresource Leveling in Line-of-Balance Scheduling}, journal={JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT}, year=2013, pages={1108-1116} }