G. E. Gürcanlı Et Al. , "Heavy Equipment Scheduling for Horizontal Construction Projects," 7th International Conference on Engineering, Project and Production Management (EPPM2016) , Bialystok, Poland, pp.265-273, 2016
Gürcanlı, G. E. Et Al. 2016. Heavy Equipment Scheduling for Horizontal Construction Projects. 7th International Conference on Engineering, Project and Production Management (EPPM2016) , (Bialystok, Poland), 265-273.
Gürcanlı, G. E., Bilir Mahçiçek, S., & Türkoğlu, H., (2016). Heavy Equipment Scheduling for Horizontal Construction Projects . 7th International Conference on Engineering, Project and Production Management (EPPM2016) (pp.265-273). Bialystok, Poland
Gürcanlı, Gürkan, Senem Bilir Mahçiçek, And Harun Türkoğlu. "Heavy Equipment Scheduling for Horizontal Construction Projects," 7th International Conference on Engineering, Project and Production Management (EPPM2016), Bialystok, Poland, 2016
Gürcanlı, Gürkan E. Et Al. "Heavy Equipment Scheduling for Horizontal Construction Projects." 7th International Conference on Engineering, Project and Production Management (EPPM2016) , Bialystok, Poland, pp.265-273, 2016
Gürcanlı, G. E. Bilir Mahçiçek, S. And Türkoğlu, H. (2016) . "Heavy Equipment Scheduling for Horizontal Construction Projects." 7th International Conference on Engineering, Project and Production Management (EPPM2016) , Bialystok, Poland, pp.265-273.
@conferencepaper{conferencepaper, author={Gürkan Emre Gürcanlı Et Al. }, title={Heavy Equipment Scheduling for Horizontal Construction Projects}, congress name={7th International Conference on Engineering, Project and Production Management (EPPM2016)}, city={Bialystok}, country={Poland}, year={2016}, pages={265-273} }