A project management system proposal to reduce change orders in the construction industry


Temel B., Gürcanlı G. E. , Bilir Mahçiçek S.

Niğde Üniversitesi Mühendislik Bilimleri Dergisi, vol.10, no.2, pp.1, 2021 (National Refreed University Journal)

  • Publication Type: Article / Article
  • Volume: 10 Issue: 2
  • Publication Date: 2021
  • Doi Number: 10.28948/ngumuh.901239
  • Title of Journal : Niğde Üniversitesi Mühendislik Bilimleri Dergisi
  • Page Numbers: pp.1