Initial preference algorithm of industrial project portfolio


Cihan E. E., ALABAŞ USLU Ç., Kabak Ö.

KYBERNETES, cilt.52, sa.12, ss.6025-6048, 2023 (SCI-Expanded) identifier identifier

  • Yayın Türü: Makale / Tam Makale
  • Cilt numarası: 52 Sayı: 12
  • Basım Tarihi: 2023
  • Doi Numarası: 10.1108/k-04-2022-0644
  • Dergi Adı: KYBERNETES
  • Derginin Tarandığı İndeksler: Science Citation Index Expanded (SCI-EXPANDED), Scopus, Academic Search Premier, Aerospace Database, Applied Science & Technology Source, BIOSIS, Communication Abstracts, Compendex, Computer & Applied Sciences, INSPEC, Metadex, zbMATH, Civil Engineering Abstracts
  • Sayfa Sayıları: ss.6025-6048
  • Anahtar Kelimeler: Project portfolio, Project complexity level, Selection criteria, Elicitation, MULTICRITERIA DECISION-ANALYSIS, RISK-MANAGEMENT, COMPLEXITY, UNCERTAINTY, SUCCESS, INTERDEPENDENCIES, INNOVATION, FRAMEWORK, SELECTION, IMPACT
  • İstanbul Teknik Üniversitesi Adresli: Evet

Özet

Purpose This paper aims to develop an algorithm to pretest an industrial portfolio on a new scale. Portfolios include complex and uncertain projects at the front-end phase. The study, therefore, proposes a procedure that helps decision-makers to handle various complex projects and defines a common scale applicable to various kinds of industrial projects. Design/methodology/approach Decision-makers can employ the preference algorithm to reach a common understanding. To this end, the current paper posits the organization of criteria in various project sets. A sexagesimal scale is developed based on project complexity and its ability to achieve broad impact, both these factors being gauged on a five-point scale of user-friendly numberings. Findings The proposed algorithm shows the equivalence of industrial projects in different fields. Also, the algorithm articulates the status in terms of uncertainty, complexity, risk, and value of projects. The connections between decision-makers and criteria operate on the basis of the foreseen complexity, risk, and value. It can be said that this study exemplifies and visualizes the portfolio and criteria relationship. Research limitations/implications The procedure covers contingency exercises at the front-end phase of a portfolio and supports decisions. However, updated information can change support positions. Originality/value The paper presents original scoring guidance for portfolio complexity on a new scale. The scaling and scoring are adjustable and calibrated using the proposed sexagesimal system. It presents an original classification of project risk and value. The main contribution is the presented algorithm which can be used to pretest industrial portfolios composed of projects that vary in both size and context.