A comprehensive evaluation of process kinetics: A plant-wide approach for nutrient removal and biogas production


Insel G., Özyıldız G., Okutman Taş D., Guven D., Zengin Balcı G. E., Pala-Ozkok I., ...Daha Fazla

WATER RESEARCH, cilt.217, 2022 (SCI-Expanded) identifier identifier identifier

  • Yayın Türü: Makale / Tam Makale
  • Cilt numarası: 217
  • Basım Tarihi: 2022
  • Doi Numarası: 10.1016/j.watres.2022.118410
  • Dergi Adı: WATER RESEARCH
  • Derginin Tarandığı İndeksler: Science Citation Index Expanded (SCI-EXPANDED), Scopus, Academic Search Premier, PASCAL, Aerospace Database, Analytical Abstracts, Applied Science & Technology Source, Aqualine, Aquatic Science & Fisheries Abstracts (ASFA), BIOSIS, Biotechnology Research Abstracts, CAB Abstracts, Chemical Abstracts Core, Chimica, Communication Abstracts, Compendex, Computer & Applied Sciences, EMBASE, Environment Index, Food Science & Technology Abstracts, Geobase, MEDLINE, Metadex, Pollution Abstracts, Veterinary Science Database, Civil Engineering Abstracts
  • Anahtar Kelimeler: Anaerobic hydrolysis, Lysis rate, Nitrification, Dynamic simulation, Biogas yield, Full-scale wastewater treatment plant, WASTE-WATER CHARACTERIZATION, ACTIVATED-SLUDGE BEHAVIOR, PRACTICAL IDENTIFIABILITY, RESPIROMETRIC ANALYSIS, MODEL CALIBRATION, GENERAL-MODEL, GROWTH-RATE, SYSTEMS, EXPERIENCE, TRANSFORMATIONS
  • İstanbul Teknik Üniversitesi Adresli: Evet

Özet

The present study investigated the deviations of operational parameters of a large-scale wastewater treatment plant (WWTP) from design basis through combining dedicated batch experiments with full-scale dynamic modeling results. The long-term process performance of a full-scale biological nutrient removal (BNR) plant equipped with anaerobic sludge digestion system was monitored to evaluate the process kinetics of both carbon and nutrient removal and anaerobic sludge digestion. In this respect, plant-specific characterization; chemical oxygen demand (COD) fractionation, batch kinetic studies and sludge settling velocity tests were performed together with plant-wide SUMO model simulation. Results showed that nitrification and anaerobic hydrolysis were found to be 30% and 70% lower than literature values, respectively. The anaerobic digestion test coupled with plant-wide model calibration showed that anaerobic hydrolysis was the bottleneck in biogas production. Correspondingly, performance of the anaerobic digestion in the full-scale plant was poor as low biogas pro-duction yields were observed. In addition, the degradation rate via anaerobic hydrolysis of primary sludge was found to be higher (~2-2.5) compared to anaerobic hydrolysis of biological sludge. The results of this study provide insight into model-based experimental characterization as well as plant-wide modeling approach. Coupling model-based batch experiments with full-scale modeling enabled to reduce the number of kinetic parameters to be fine-tuned. Moreover, the information gathered from kinetic batch tests to the simulation platform yielded a satisfying prediction of long-term performance of the plant operation.