Team based labour assignment methodology for now product development projects


Baysan S., Durmuşoğlu M. B., Çınar Ünal D.

COMPUTERS & INDUSTRIAL ENGINEERING, cilt.106, ss.83-104, 2017 (SCI-Expanded) identifier identifier

  • Yayın Türü: Makale / Tam Makale
  • Cilt numarası: 106
  • Basım Tarihi: 2017
  • Doi Numarası: 10.1016/j.cie.2016.11.032
  • Dergi Adı: COMPUTERS & INDUSTRIAL ENGINEERING
  • Derginin Tarandığı İndeksler: Science Citation Index Expanded (SCI-EXPANDED), Scopus
  • Sayfa Sayıları: ss.83-104
  • İstanbul Teknik Üniversitesi Adresli: Evet

Özet

This study explores the organizational aspects of new product development projects and proposes a new team-based labour assignment methodology. The proposed hierarchical methodology focusses on the project value stream and aims to shorten lead time through waste reduction. Lean product development tools, such as clustering and design structure matrix tools, are integrated with the methodology. A detailed real-life case study is presented and the proposed methodology is evaluated using discrete event simulation. Experiment results show that the proposed methodology and team-based structure provide superior lead time performance when compared to conventional organizational setting. This study contributes to existing literature by presenting evidence of the effect of teams on NPD lead time performance. (C) 2016 Elsevier Ltd. All rights reserved.