A Conceptual Perspevtive via Meta-Heuristic Optimization Algorithm for Resource Levelling in Project Networks


EBESEK Ş., YAMAN H.

3. International Conference on Civil and Environmental Engineering, İzmir, Turkey, 24 - 02 April 2018, vol.2, pp.648-657

  • Publication Type: Conference Paper / Full Text
  • Volume: 2
  • City: İzmir
  • Country: Turkey
  • Page Numbers: pp.648-657